Friday, July 15, 2005

Finished a Tub/Shower tile job yesterday

Fun stuff :-). Not too bad. I clear about $250 every time I do one. I think this is my 6th tub/shower. I had to rip out the old plastic insert they had on the tub walls, fix some of the sheet rock, put up the cement backer board, apply the tile, then grout.

Stupid me though. I always have intentions of getting before pictures, but I forget and end up taking pictures on the 2nd or 3rd step. Pisses me off. Either way, the previous set-up was disgusting! Had tons of mold in the corners and about 2" thick of caulk along the bottom (which was all moldy too). Anyway, this looks much better. Got it done in 3 days too!